The casework arrived and is being installed.

The casework boxes line the hallway.

I have never been so excited to see floor tile!

The trenches seen in the earlier photos were a surprise finding when they pulled up the old tile. It turns out that this was a teaching lab at one point and there were trenches with steam lines dug in the floor that nobody knew about.

Here are some pictures of what the lab looked like on Dec 15, 2016. The first picture is of the laser lab and the second is a smaller room for a prep lab.

The pre-construction meeting, even though you can see the walls are already framed and demolition of the old infrastructure has begun.